Jan 79 - Jun 79.Staff
Engineer assigned to the Air Force Payload Integration Contract.Responsible for separation/deployment of all Air Force payloads from
Space Shuttle Orbiter.Reviewed
and approved contractor analyses and test plans.
Jul 76 - Jan 79.Senior
Engineer assigned to the Space Shuttle Solid Rocket Booster Decelerator
Project.Performed trajectory
prediction and reconstruction, system analysis, and test for the SRB
recovery subsystem.
Nov 74 - Jul 76.Assigned
to Air Force Titan III B/D Project.Responsible
for ascent trajectory prediction and reconstruction, range safety studies,
launch tower clearance trajectories.
Aug 71 - Nov 74.Assigned
to NASA Viking Project, Mission Analysis Section.Responsible for Mars entry trajectory simulation, vehicle staging
analysis, orbiter/lander separation analysis and test.